Our Process

Most homeowners want to know what to expect before signing anything. Here’s the exact sequence we run, and how long each phase typically takes.

1. Consultation (Week 0)

Free, in-home or video. We measure, look at what’s already there, and talk through what you want to change. You leave with a written estimate range — not a final number, but enough to know if the project fits your budget.

2. Design & selections (Weeks 1–3)

If you move forward, our designer drafts the layout, picks finishes with you, and produces a 3D rendering plus a detailed quote with line items you can trim or upgrade. This is the back-and-forth phase — most projects go through two or three revisions before sign-off.

3. Permits & ordering (Weeks 3–5)

We pull any required permits with the City of Dallas (or your municipality) and place orders for cabinetry and stone. Lead times vary; we publish the demo date once everything has a confirmed delivery date.

4. Build (Weeks 6–14)

Demo, rough-ins, drywall, paint, cabinet install, counter template + install, tile, lighting, appliance hookup. One project lead is on-site or reachable every workday. You get a Friday update with photos and what’s coming the following week.

5. Walkthrough & punch list (Week 14–15)

We do a walkthrough with you and write down everything that needs touch-up. Then we have 10 working days to clear the punch list. After that, you get the final invoice and a one-year workmanship warranty.